Shanghai Rotorcomp Screw Compressor Co., Ltd.
  • Rotary Screw Compressor Historical well-known manufacturer producing quality screw compressor,oil free compressor,high pressure compressor in ISO,TUV,CE certificates with good price, 5 years warranty, patented unique design, more energy-saving , reliable compressor system for al Rotary Screw Compressor
  • Oil Free Compressor Shanghai rotorcomp screw compressor offer 100% clean oil free air compressor that can be made in air cooled &water cooled, we can customize according to the special requests, and OEM service... Oil Free Compressor
  • Air Treatment Systems After-processing equipment of compressorISO,CE,TUV,ASME standard manufacturer producing quality Refrigerated air dryer,Desiccant air dryer, precised pipe filter from 1micron to 0.001micron, active-car... Air Treatment Systems
  • Diesel Movable Screw Compressor Diesel movable screw compressorReliable diesel portable screw compressor manufacturer producing quality diesel screw compressor from 50cfm--1600cfm@100psi-500psi in ISO,TUV,CE certificates with good p... Diesel Movable Screw Compressor
  • Screw Air End SCREW AIR ENDWorld-top Rotorcomp compact air screw compressor with best efficient in smaller demension in ISO,TUV certificates, 5 years warranty.Rotorcomp oil-injected screw air ends create the heart ... Screw Air End
CONATCT
Tel: +86-021-67150020
Fax: +86-021-67150020
Add: No.28 Minta Road, Songjiang District Shanghai, China
code

Maintenance

PERIODIC MAINTENANCE TABLE

Item

Content

Replacing intervals(hours)

Remark

500

1000

1500

2000

4000

8000

Element of

Air Filter

Clean external dusts

*






Prolong or shorten

replacing interval

according to dust volume

Replace element of filter




*



Specialied coolant

Quality coolant

*1st




*+


sample once every week,check oil.replace when necessary

Super coolant





*1st

*++

Suction Valve

Check





*


replace when need

Oil Filter

Replace new filter

*1st



*




Oil-air Separator

Replace new separator





*



MIN. Pressure Valve

Check opening pressure





*



De-Dust Cooler

Clean external dusts

*






Air cooled. Prolong or shorten according to the working condition

Descale Cooler

Clean internal scale



*




Water cooled. Prolong or shorten according to the working condition

Safety Valve

check sensitive or not






*


Soneloid valve

Check


*






Pressure gauge

check



*





Drain Valve

Check whether blocked


*






Condensate drain

discharge condensate in oil tank


*






Replace according to wear-out condition

Motor

Fill lubricating condensate





*


refer to guideline of motor

Electric

check main connection and poles

*






1st check should be done after 150 hours service

Belt


check and adjust



*




1st check should be done after 150 hours service


Remarks:*--- Regular Maintenance in clean working environment according to above intervals. Shorten Maintenance interval for belt, coolant, oil filter, air filter for sale element and oil fine separator in scurviness working condition.
*+---replacement interval of quality coolant is 4000hours or one year, if sooner than required by operation hours.
*++---replacement interval of super coolant is 8000hours or two year, if sooner than required by operation hours.

When carrying out regular maintenance, please check air/oil tank, air discharge pipeline, cooler as well as components conducting and bearing heat, clean oil scale and accumulated carbon subjects.

  • TEL:+86-021-67150020
  • FAX:+86-021-67150020
  • EMAIL:sales@rotorcompressor.com
  • ADDRESS:No.28 Minta Road, Songjiang District Shanghai, China